North Elevation Drone Shot
![DCIM100MEDIADJI_0147.JPG](http://translatedphoenixmart.com/wp-content/uploads/South-Elevation-2-5-2017-revised.jpg)
The tilt-wall panel installation on the east, west & north elevations have been completed this week. The masonry work on the south side of the building has also begun. A substantial amount of the steel vertical assemblies have been installed as well. The core & shell will substantially be completed along with the topping off of most the building by the end of March.